CEI: Project Profiles Construction Program Management Fried Chicken Company at LEGOLAND Winter Haven, Florida This project consisted of the new construction of a restaurant facility at the…

CEI: Project Profiles

Construction Program Management
Field Services



Fried Chicken Company at LEGOLAND

Winter Haven, Florida
This project consisted of the new construction of a restaurant facility at the LEGOLAND theme park.

MEG APPROACH:

We provided geotechnical field exploration and engineering services, as well as construction materials testing and inspection services for this project.

MEG BENEFIT:

MEG provided a limited-access drill rig for the geotechnical exploration which allowed the exploration to proceed with negligible disturbance to the existing park facilities and on an extremely accelerated schedule. MEG also worked closely with the Contractor to ensure all construction materials testing and inspection services were performed and accepted by the Owner in order for the facility to open on schedule.

State Road 60 Emergency Repairs

Mulberry, Florida
This project consisted of repairing a section of S.R. 60 that was washed out due to a drainage failure.

MEG APPROACH:

MEG provided Contractor Quality Control testing and inspection services for this project. Specific work for this project included earthwork construction inspection and laboratory testing of soils, and asphalt paving inspection.

MEG BENEFIT:

MEG provided overnight inspection and testing services and 24-hour turnaround on laboratory results in order to allow the Contractor to proceed with construction and minimize inconvenience to the traveling public.

Bartow Northern Connector (Ernest Smith Boulevard)

Polk County, Florida
This project consists of the new construction of approximately 2 miles of four lane divided highway between US 98 and US 17. A new bridge over Saddle Creek on a driven pile foundation is also being constructed.

MEG APPROACH:

MEG is providing Contractor Quality Control testing and inspection services for this project. Specific work for this project includes earthwork construction inspection and laboratory testing of soils, concrete field and laboratory testing, Quality Control Management services and pile driving inspection.

MEG BENEFIT:

Due to MEG’s extensive experience in geotechnical exploration and soils engineering, when unanticipated groundwater and soil conditions, as well as difficult pile driving conditions were encountered by the Contractor, MEG provided geotechnical borings and laboratory testing support that ultimately allowed the Contractor and the Owner to successfully resolve those issues without significant design changes or cost increases.

Madrid Engineering Awarded MBE Supplier of the Year 2017!
Learn More!